skip to main |
skip to sidebar
GBA serving as the local design consultant for the City of Liberty’s $64
million design-build Utility Operations Center that will house the wastewater
treatment facility. GBA’s responsibilities include the design of 1,000 linear
feet of 36-inch inch interceptor sewer; 400 linear feet of a 48-inch diameter
railroad tunnel; two 10 MGB submersible pumping stations; 15,000 linear feet of
20-inch diameter force main; two flow metering structures; 7,700 linear feet of
two-lane roadway; surveying and easement preparation. Architectural,
structural, mechanical and electrical design of the administration building and
two vehicle storage and maintenance buildings is also being provided.
No comments:
Post a Comment