Tuesday, January 28, 2014

Winter Survival

With winter in full swing and the return of the polar arctic blast, now is a good time to review a few winter survival tips. Here are a few things you should keep in your car:
  • A fully-charged cell phone and adapter
  • Flashlight and extra batteries
  • Battery jumper cables
  • Snack food and water
  • Blanket or sleeping bag and extra socks, shoes, hats and gloves    
  • Shovel
  • Road salt, sand or cat litter to use under your tires to gain traction
Hopefully, you will move through the winter with ease and peace of mind by following a few smart tips and always keeping your car gas tank at least half full. For more ways to get through winter, please check out: http://stayalertkc.com/kansas-winter-survival/

Wednesday, January 22, 2014

GBA Needs You

As GBA welcomes in the New Year, we are excited about the new projects we’ll be working on in 2014. With the projects comes a need for more staff. As students begin the final semester at school or look for summer internships, we encourage you to look for us at the upcoming career fairs and visit our website for available positions. We look forward to the meeting you and hope you’ll become a part of the GBA family.

Please look for us at one of the upcoming career fairs at the following universities:

February 11, 2014
University of Missouri - Columbia, MO
Kansas State University - Manhattan, KS
Iowa State University - Ames, IA

February 13, 2014
University of Nebraska, Lincoln - Lincoln, NE
University of Kansas - Lawrence, KS

February 18, 2014
Missouri University of Science and Technology - Rolla, MO

February 19, 2014
University of Missouri Kansas City - Kansas City, MO

College students are not the only staff we are looking for, so please visit our careers page to see all of our available opportunities.

Thursday, January 16, 2014

Protecting Concrete from Deicing Chemicals

Last month we discussed the detrimental effects deicing chemicals can have on concrete. This month, we will discuss ways to protect concrete from these harmful effects
 
Air Entrainment, Air Entrainment, Air Entrainment
Incorporating the proper amount of entrained air into concrete is very effective in mitigating the harmful effects of moisture freezing in concrete. Air entrainment is the intentional incorporation of numerous tiny air voids in the concrete paste. These tiny air voids provide areas for the freezing and migrating moisture to enter before they produce expansive pressure on the concrete. Air entrainment is even more critical to freezing concrete when deicing chemicals are applied.
 
Low Permeability
Concrete that is less permeable is less likely to become saturated, is more resistant to sulfate and other chemical attack, and is more resistant to chloride-ion penetration. Permeability can be lowered by using a low water-cement ratio (preferably below 0.45) and an adequate moist-curing period (preferably 7 days).
 
Adequate Drying after Curing
After concrete is properly moist-cured, it should air dry for at least 30 days before it is exposed to freezing or deicing chemicals. At the end of the moist-curing process, the
concrete is still saturated. This moisture can still freeze and expand, deteriorating the concrete. This is why adequate drying is the most overlooked detail in protecting concrete from deicing chemicals.

The drying rate of concrete cured with a membrane-forming compound is much slower than the drying rate of concrete without a membrane-forming compound. When concrete is scheduled for placement in the fall, especially late fall, consider whether postponing the placement until spring is an option. If postponement is not an option, which is often the case, using a moist-cure method instead of a membrane cure will give the concrete a better chance of drying before being exposed to freezing and deicing chemicals.

Durable Aggregates
Aggregates that perform well under freeze/thaw cycles should be used. Low porosity, absorption and permeability are aggregate qualities that help prevent harmful effects from the freeze/thaw cycle. Durable aggregates can also help mitigate alkali-silica reaction (ASR) between cement and aggregate. ASR causes excessive expansion that deteriorates concrete.

Protect Reinforcing Steel
The chloride-ions in most deicing chemicals will aggressively corrode reinforcing steel. Because rust expands to four times its original volume, the protection of reinforcing steel from deicing chemicals is critical. This can be done in the following ways:
  • The use of low permeability concrete will slow the rate of penetration of chloride-ions thru the concrete, thereby buying time before the steel starts to corrode. In addition to the suggestions above, silica-fume and latex can be added to concrete to make it less permeable.
  • Epoxy-coat the reinforcing steel. The epoxy coating acts as a barrier between the reinforcing steel and the chloride-ions in the concrete.
  • Increase the thickness of concrete cover over the reinforcing steel. This forces the chloride-ions to travel further thru the concrete to reach the reinforcing steel.
  • Overlays. The concrete surface can be overlaid with a waterproof material to keep chlorides from penetrating the concrete and reaching the reinforcing steel. Overlays should be evaluated for water tightness, durability (especially when exposed to snow removal equipment) and longevity (especially UV rays).
  • Provide cathodic protection. The first method of providing cathotic protection is with an impressed current cathodic system. This system induces a small electrical current into the reinforcing steel in the opposite direction of the electrical current found in reinforcing steel during the corrosion process. Cathodic protection is the only system that can actually reverse the corrosion process and stop corrosion. However, it is expensive and difficult to install and maintain.
    The second form of cathodic protection is through the use of sacrificial galvanic anodes. After the galvanic anodes are connected to the reinforcing steel, they will sacrifice themselves and greatly reduce the rate of corrosion in the reinforcing steel.  However, once the sacrificial anode is totally sacrificed, the corrosion of the reinforcing steel will once again accelerate.
When we are forced to use deicing chemicals for public safety, we are also forced to find ways to minimize the costly deterioration that deicing chemicals can cause. Hopefully, some of these suggestions will help you provide concrete with a lower overall life-cycle cost.

Wednesday, January 8, 2014

GBA Wins Engineering Excellence Award

GBA was awarded an American Council of Engineering Companies of Kansas (ACEC KS) Engineering Excellence Award for the Resourceful Kansas project. The award will be given
at the organization’s annual membership luncheon in June. By winning the state award, it is also eligible for the National ACEC Engineering Excellence Award. The results of the National Award will be given in April.

Funded by a $3 million Department of Energy grant, Resourceful Kansas was designed to engage communities statewide in making a fundamental shift toward a less energy-intensive, more efficient economy.

GBA helped provide 24 educational seminars to various organizations across the state providing over 400 participants an opportunity to learn about sustainable technologies and practices to improve energy efficiency. Following the seminars, GBA conducted energy assessments for 83 selected organizations that addressed energy and water usage, renewable energy generation and transportation energy impacts. GBA also served as project manager for the full $3 million project, including meeting federal government reporting requirements.  All together, GBA covered over 4,850,000 square feet of floor space and identified over 4,675,000 kWh in energy savings that would be achieved with a payback less than five years.

Congrats to everyone that helped with Resourceful Kansas!

Thursday, January 2, 2014

GBA Expands Office in Colorado

Over the past couple months, work has been underway to double the office space and add staff in the Broomfield office. Based on consistent success in securing projects along the Front Range, we now have six full-time staff and two open positions to add design capabilities. Click here to explore Careers on our website!