GBA
provided structural engineer services for the new 72,000 square foot Olathe
Community Center currently under construction at Stagecoach Park in Olathe, KS
(scheduled to open mid-2014). Amenities at the facility include an
aquatic space complete with waterslides and a lazy river, cardio and weight
training areas, fitness studios, a gymnasium with basketball and volleyball
courts, an elevated indoor walking and jogging track, multi-purpose activity
rooms, locker facilities, and childcare space.
The building design features a dramatic wood glulam
entrance canopy that flows into the central lobby of the facility with exposed
building columns and lateral bracing accented with wood. The central
lobby divides the space between the community wing and the fitness wing of the
facility. The high bay, curved roof for the fitness wing consists long
span steel joist girders that clear-span the gymnasium and natatorium areas,
supported by load bearing masonry walls. Roof overhangs are framed with
structural kickers that accent the exterior façade of the building. The
curved roof line of the fitness wing is replicated on the low bay community
wing by cantilevering the building columns up above the roof line to support
the roof overhangs. The building columns and walls of the facility are
supported by drilled pier foundations that extend bedrock, approximately 10’ below
grade.
Rendering of Community Center |
No comments:
Post a Comment